waves = energy

icono de una gota

Objectiv 1

This is a custom heading element.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

icono de una gota

Objectiv 2

This is a custom heading element.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

icono de una gota

Objectiv 3

This is a custom heading element.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

icono de una gota

Objectiv 4

This is a custom heading element.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

icono de una gota

Objectiv 5

This is a custom heading element.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

icono de una gota

Objectiv 6

This is a custom heading element.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

18

WORK PACKAGES

Objectives

  • To carry out project management, co-ordination, and reporting activities necessary to ensure a successful project during Period 1 of the project
  • To implement the project management principles described in the Project Management section
  • To ensure effective implementation of the project in line with guidelines from the European Commission, the Project Grant Agreement, and the Consortium Agreement
  • To increase the likelihood of the successful completion of the project

Description

Task 1.1 Develop project management plan and intranet
Task 1.2 Develop data management plan

Objectives

  • To carry out project management, co-ordination, and reporting activities necessary to ensure a successful project during Period 1 of the project
  • To implement the project management principles described in the Project Management section
  • To ensure effective implementation of the project in line with guidelines from the European Commission, the Project Grant Agreement, and the Consortium Agreement
  • To increase the likelihood of the successful completion of the project

Description

Task 2.1 Manage project and update management plans

Objectives

  • To develop the current Wavepiston wave-to-wire numerical model to include new components and functionality
    required for the proposed control and condition investigations
  • To develop a hydraulic network model of the proposed hydraulic system that is suitable for representation of the
    dynamic passive controller and condition controller

Description

Task 3.1: Development of hydraulic network model
Task 3.2: Development of wave-to-wire numerical model

Objectives

  • To develop a control strategy for a dynamic passive controller that will minimise the levelized cost of energy

Description

Task 4.1: Adaption of numerical model for dynamic passive controller design
Task 4.2: Optimisation of control strategy

Objectives

  • To develop a tool for the modelling of the PTO condition
  • To identify potential condition signatures that may be used for condition control

Description

Task 5.1: Adaption of numerical model for design of condition controller
Task 5.2: Identification of potential condition signatures
Task 5.3: Investigation into remaining useful life

Objectives

  • To set up a reference framework for reliability analysis
  • To ensure that the full product lifecycle is considered in its design
  • To produce data that supports ‘Circularity by design’
  • To produce a parametrisation of the levelized cost of energy (LCOE) for use in design optimisation

Description

Task 6.1: Identify baseline lifecycle impacts (Lead: JCC, Contributors: WP, FP, LS)
Task 6.2: Update and refine parametric levelized cost of energy tool
Task 6.3: Framework for reliability assessment and analysis (Lead: JCC, Contributors: WP, MU, LS, FP)
Task 6.4: Development of model for analysis of weather-windows (Lead: MU, Contributors: WP, JCC, PL)

Objectives

  • To produce the front-end engineering design for the novel pump and controller valve
  • To incorporate ‘Circularity by design’ in the design process

Description

Task 7.1: Fundamental analysis of alternative hardware configurations
Task 7.2: Front-end engineering design of PTO system

Objectives

  • To produce a prototype of the pump for testing in the hardware-in-the-loop facilities at DTU

Description

Task 8.1: Production of parts list and detailed engineering drawings for prototype pump
Task 8.2: Purchase of parts and fabrication of prototype pump

Objectives

  • To produce a prototype of the valve for testing in the hardware-in-the-loop facilities at DTU

Description

Task 9.1: Production of parts list and detailed engineering drawings for prototype valve
Task 9.2: Purchase of parts and fabrication of prototype valve

Objectives

  • To produce data for calibration of the numerical models
  • To produce data for validation of the numerical models in realistic conditions
  • To assess the performance of the prototypes and controllers in realistic conditions

Description

Task 10.1: Planning, installation, and commissioning of hydraulic system in DTU laboratory
Task 10.2: Testing for calibration of numerical models
Task 10.3: Validation of performance in realistic conditions

Objectives

  • To utilise the knowledge gained in testing the first prototype
  • To produce improved designs of the pump and valve
  • To update the design of the dynamic passive controller

Description

Task 11.1: Detailed hydraulic analysis of control strategy
Task 11.2: Update dynamic passive controller
Task 11.3: Review and revision of hydraulic system design

Objectives

  • To assess long-term performance, reliability, and maintenance requirements
  • To generate data for the design and validation of the condition controller

Description

Task 12.1: Accelerated testing for determination ofreliability and maintenance requirements (Lead: DTU, Contributors:
Task 12.2: Assess potential to increase remaining useful life by modification to control strategy

Objectives

  • To produce a revised prototype of the pump for testing in the Wavepiston offshore test bench

Description

Task 13.1: Production of parts list and revised detailed engineering drawings for second prototype pump
Task 13.2: Purchase of parts and fabrication of second prototype hydraulic pump

Objectives

  • To produce a revised prototype of the valve for testing in the Wavepiston offshore test bench

Description

Task 14.1: Production of parts list and revised detailed engineering drawings for second prototype valve
Task 14.2: Purchase of parts and fabrication of second prototype hydraulic valve

Objectives

  • To produce data for validation of the numerical models in realistic conditions
  • To assess long-term performance, reliability, and maintenance requirements
  • To assess the performance of the second prototypes and controllers in realistic conditions

Description

Task 15.1: Installation and commissioning of hydraulic system at the PLOCAN offshore test bench (Lead: PL,
Task 15.2: Monitoring second prototype performance (Lead: PL, Contributors: WP)
Task 15.3: Analysis of second prototype performance (Lead: WP, Contributors: PL, MU, MSM, ARR)
Task 15.4: Analysis of refined control strategy on hydraulic design (Lead: MSM, contributors: PL, MU, WP, DTU, ARR)

Objectives

  • To update the LCOE tool with additional data generated in the project
  • To assess the LCA of the final designs
  • To review the application of ‘Circularity by design’
  • To assess and evaluate the overall reliability of the innovative power take-off system
  • To assess the overall impacts of the project

Description

Task 16.1: Update reliability analysis
Task 16.2: Update LCOE tool based on performance of condition controller
Task 16.3: Life cycle assessment of final products
Task 16.4: Overall Impact assessment

Objectives

  • To elaborate a successful dissemination plan that includes consideration of gender balance and open access in order to reach out to all potential stakeholders
  • To disseminate scientific progress whilst maintaining IPR ownership
  • To develop an effective innovation strategy, and manage the resulting IPR

Description

Task 17.1: Develop and maintain the dissemination, communication, and exploitation plan
Task 17.2: Develop the innovation strategy and manage the resulting IPR

Objectives

  • To maintain the dissemination plan
  • To disseminate scientific progress whilst maintaining IPR ownership
  • To manage the resulting IPR
  • To achieve public outreach through a controller design competition
  • To develop an effective post-project exploitation strategy

Description

Task 18.1: Maintain the dissemination and communication plan
Task 18.2: Implementation of dynamic passive controller competition
Task 18.3: Development of post-project exploitation plan
Task 18.4: Investigation into applicability ofresults in other technologies